Khisbulloh, Wijaya, and Gatot Yudoko. 2024. “OEE Improvement through Reducing Start up Duration Using Lean Six Sigma Methodology in Manufacturing”. Journal of Multidisciplinary Academic and Practice Studies 2 (3):277-93. https://doi.org/10.35912/jomaps.v2i3.2226.