Khisbulloh, W. and Yudoko, G. (2024) “OEE improvement through reducing start up duration using lean Six Sigma methodology in manufacturing”, Journal of Multidisciplinary Academic and Practice Studies, 2(3), pp. 277–293. doi: 10.35912/jomaps.v2i3.2226.