Article Details
Vol. 1 No. 2 (2026): February
Digital Tools for Project Time Management: Scheduling Performance Improvement in Emerging Economies
Abstract
Purpose: This study examines the role of digital tools in improving schedule performance for project time management in emerging economies. It focuses on the impact of Project Management Information Systems (PMIS), Building Information Modeling (BIM/4D/5D), and artificial intelligence-based analytics on project time efficiency.
Methodology/approach: The research employs a conceptual review and analytical framework, synthesizing existing empirical evidence from open sources. The study analyzes how digital tools affect schedule performance, integrating Project Time Management Theory and Principal–Agent Theory.
Results/findings: The findings indicate that digital tools like PMIS and BIM/4D/5D enhance schedule performance by improving planning accuracy, real-time monitoring, and decision-making speed. However, their effectiveness depends on the technological infrastructure and institutional readiness in emerging economies..
Conclusion: Digital transformation is essential for improving project scheduling in emerging economies. A phased approach, starting with PMIS, followed by 4D/5D BIM integration, and AI adoption, provides the most effective strategy.
Limitations: The study relies on secondary data from publicly available sources, which may lack consistency. Additionally, the analysis focuses on schedule performance and does not include cost or scope performance.
Contribution: This research contributes valuable insights into the role of digital tools in project time management, offering practical recommendations for policymakers and practitioners in emerging economies.
Keywords
How to Cite
Download Citation
References
- Ahuja, R., Sawhney, A., Jain, M., Arif, M., & Rakshit, S. (2020). Factors Influencing BIM Adoption in Emerging Markets–The Case of India. International journal of construction management, 20(1), 65-76. doi:https://doi.org/10.1080/15623599.2018.1462445
- Alsofiani, M. A. (2024). Digitalization in Infrastructure Construction Projects: A PRISMA-Based Review of Benefits and Obstacles. Astronomy & Computing, 1-8. doi:https://doi.org/10.48550/arXiv.2405.16875
- Bianchi, M. J., Conforto, E. C., & Amaral, D. C. (2021). Beyond the Agile Methods: A Diagnostic Tool to Support the Development of Hybrid Models. International Journal of Managing Projects in Business, 14(5), 1219-1244. doi:https://doi.org/10.1108/IJMPB-04-2020-0119
- Bustami, K., & Saifrizal, M. (2025). Project Performance in Infrastructure Development: Analysis of Time and Quality Control Against Budget Allocation. Journal Informatic, Education and Management (JIEM), 7(2), 527-535. doi:https://doi.org/10.61992/jiem.v7i2.169
- Chen, M., Martins, T. S., Zhang, L., & Dong, H. (2025). Digital Transformation in Project Management: A Systematic Review and Research Agenda. Systems, 13(8), 1-23. doi:https://doi.org/10.3390/systems13080625
- Dagou, H. H., Gurgun, A. P., Koc, K., & Budayan, C. (2025). The Future of Construction: Integrating Innovative Technologies for Smarter Project Management. Sustainability, 17(10), 1-29. doi:https://doi.org/10.3390/su17104537
- Das, K., Khursheed, S., & Paul, V. K. (2025). The Impact of BIM on Project Time and Cost: Insights from Case Studies. Discover Materials, 5(1), 1-18. doi:https://doi.org/10.1007/s43939-025-00200-2
- Doukari, O., Seck, B., & Greenwood, D. (2022). The Efficient Generation of 4D BIM Construction Schedules: A Case Study of the Nanterre 2 CESI Project in France. Frontiers in Built Environment, 8, 1-18. doi:https://doi.org/10.3389/fbuil.2022.998309
- Du, S., Hou, L., Zhang, G., Tan, Y., & Mao, P. (2024). BIM and IFC Data Readiness for AI Integration in the Construction Industry: A Review Approach. Buildings, 14(10), 1-54. doi:https://doi.org/10.3390/buildings14103305
- Gao, Y., & Wang, B. (2026). Digital Project Management in the Construction Industry: Bim,Ai and Pmis as Drivers of Sustainable Performance. International Journal of Multidisciplinary Research, 2(1), 20-24. doi:https://doi.org/10.65231/ijmr.v2i1.67
- Hashimzai, I. A., & Mohammadi, M. Q. (2024). The Integration of Artificial Intelligence in Project Management: A Systematic Literature Review of Emerging Trends and Challenges. TIERS Information Technology Journal, 5(2), 153-164. doi:https://doi.org/10.38043/tiers.v5i2.5963
- Irankunda, G., Zhang, W., Abdullahi, U. I., Fernand, M., David, B., & Jean-Petit, S. (2025). Understanding Critical Delay Causative Factors and Their Mitigation Measures in Burundi Communal Construction Projects: A Factor Analysis and Structural Equation Modeling Approach. Buildings, 15(3), 1-29. doi:https://doi.org/10.3390/buildings15030473
- Khahro, S. H., Shaikh, H. H., Zainun, N. Y., Sultan, B., & Khahro, Q. H. (2023). Delay in Decision-Making Affecting Construction Projects: A Sustainable Decision-Making Model for Mega Projects. Sustainability, 15(7), 1-22. doi:https://doi.org/10.3390/su15075872
- Khasawneh, M. A., & Dweiri, F. (2025). Influence of Digital Infrastructure on Project Management Success: Readiness, Fitness, and Tools as Moderators. Emerging Science Journal, 9(6), 3319-3348. doi:https://doi.org/10.28991/esj-2025-09-06-024
- Khoshkonesh, A., Mohammadagha, M., & Ebrahimi, N. (2025). Integrated 4D/5D Digital-Twin Framework for Cost Estimation and Probabilistic Schedule Control: A Texas Mid-Rise Case Study. Computational Engineering, Finance, and Science, 1-22. doi:https://doi.org/10.48550/arXiv.2511.15711
- Kurniawan, R., & Sushandoyo, D. (2025). Bridging the BIM Maturity Gap in Developing Country: A Change and Knowledge Management Framework for Enhancing Project Values. European Journal of Business and Management Research, 10(4), 198-202. doi:https://doi.org/10.24018/ejbmr.2025.10.4.2736
- Lakhamraju, M. V. (2024). Digital Transformation in Project Management: Tools, Challenges, and Best Practices. Journal of Information Systems Engineering and Management, 10(52), 927-939. doi:https://doi.org/10.52783/jisem.v10i52s.10885
- Pamuji, S., Ni’mah, T., Baharuddin, K., Novianto, A., Wibowo, E., & Kasmin, K. (2025). Time Management: The Key to Success in Managing Complex Projects. International Journal of Multidisciplinary Approach Research and Science, 3(1), 124-134. doi:https://doi.org/10.59653/ijmars.v3i01.1234
- Pittri, H., Godawatte, G. A. G. R., Esangbedo, O. P., Antwi-Afari, P., & Bao, Z. (2025). Exploring Barriers to the Adoption of Digital Technologies for Circular Economy Practices in the Construction Industry in Developing Countries: A Case of Ghana. Buildings, 15(7), 1-31. doi:https://doi.org/10.3390/buildings15071090
- Plattfaut, R. (2022). On the Importance of Project Management Capabilities for Sustainable Business Process Management. Sustainability, 14(13), 1-12. doi:https://doi.org/10.3390/su14137612
- Qadir, S., Alawag, A. M., Baarimah, A. O., Zia, N., Alajmi, M., Almujibah, H. R., & Alyami, H. (2025). The Role of Digital Technologies in Enhancing Construction Project Management. Scientific Reports, 16, 1-32. doi:https://doi.org/10.1038/s41598-025-31955-6
- Ramandhani, E. A., Lenggogeni, L., & Yasinta, R. B. (2025). Penerapan Teknologi Building Information Modeling (BIM) 4D pada Manajemen Waktu dalam Proyek Konstruksi. Jurnal Pendidikan Tambusai, 9(2), 22667-22673. doi:https://doi.org/10.31004/jptam.v9i2.30209
- Rehman, I. U., Mazher, K. M., & Wuni, I. Y. (2025). Systematic Review of 4D BIM Benefits in Construction Projects. Results in Engineering, 28, 1-17. doi:https://doi.org/10.1016/j.rineng.2025.107091
- Rokooei, S. (2015). Building Information Modeling in Project Management: Necessities, Challenges and Outcomes. Procedia-Social and Behavioral Sciences, 210, 87-95. doi:https://doi.org/10.1016/j.sbspro.2015.11.332
- Sava?, S. (2025). Artificial Intelligence in Construction Project Management: Trends, Challenges and Future Directions. Journal of Design for Resilience in Architecture and Planning, 6(2), 221-238. doi:https://doi.org/10.47818/DRArch.2025.v6i2165
- Shah, F. H., Bhatti, O. S., & Ahmed, S. (2023). Project Management Practices in Construction Projects and Their Roles in Achieving Sustainability—A Comprehensive Review. Engineering Proceedings, 44(1), 1-5. doi:https://doi.org/10.3390/engproc2023044002
- Shoushtari, F., Daghighi, A., & Ghafourian, E. (2024). Application of Artificial Intelligence in Project Management. International journal of industrial engineering and operational research, 6(2), 49-63. doi:https://doi.org/10.22034/ijieor.v6i2.89
- Sobirovich, B. N. (2021). Prospects for Development of BIM Technologies in Uzbekistan. ACADEMICIA: An International Multidisciplinary Research Journal, 11(12), 804-808. doi:https://doi.org/10.5958/2249-7137.2021.02743.9
- Succar, B. (2009). Building Information Modelling Framework: A Research and Delivery Foundation for Industry Stakeholders. Automation in construction, 18(3), 357-375. doi:https://doi.org/10.1016/j.autcon.2008.10.003
- Villena-Manzanares, F., García-Segura, T., & Pellicer, E. (2020). Organizational Factors That Drive to BIM Effectiveness: Technological Learning, Collaborative Culture, and Senior Management Support. Applied Sciences, 11(1), 1-16. doi:https://doi.org/10.3390/app11010199