Article Details
Vol. 2 No. 4 (2026)
The Impact of International Management Strategies on the Quality of Implementation in Vertical Housing Projects a Case Study in the Diyala Housing Department
Abstract
Purpose: This study explores how international management strategies can improve the execution quality in vertical housing projects.
Research Methodology: A descriptive-analytical approach was used, based on insights from 42 professionals (project managers, engineers, and site supervisors) with direct experience in vertical housing projects. The study investigates the correlation between internationally-oriented management practices and the quality of execution on the ground.
Results: The findings show a statistically significant positive correlation between the adoption of international management strategies and improved project execution. Projects using structured planning systems, accepted quality control standards, and managerial techniques were more compliant with technical requirements, more efficient in their work, and had better overall performance.
Conclusions: The results underscore the strategic importance of international management strategies as a source of excellence in modern urban development projects. Integrating global best practices enhances coordination among project stakeholders and supports sustainable performance improvement in complex construction environments. The study emphasizes the need to institutionalize internationally-aligned management frameworks to ensure long-term quality and competitiveness in vertical housing projects.
Limitations: The study relies on expert opinions, which may be subjective and context-dependent. Further empirical testing is needed with a larger sample across various regions and project types.
Contributions: The research contributes empirical evidence on the relationship between international management strategies and project execution quality in vertical housing, offering a basis for developing globally-aligned management frameworks in the construction industry.
Keywords
How to Cite
Download Citation
References
- Alawag, A. M., Alqahtani, F. K., Alaloul, W. S., Liew, M., Baarimah, A. O., Al-Mekhlafi, A.-B. A., & Sherif, M. A. (2024). Developing framework for implementing total quality management (TQM) in sustainable industrialized building system (IBS) in construction projects. Sustainability, 16(23), 10399. doi:https://doi.org/10.3390/su162310399
- Arditi, D., & Gunaydin, H. M. (1997). Total quality management in the construction process. International journal of project management, 15(4), 235-243. doi:https://doi.org/10.1016/S0263-7863(96)00076-2
- Baird, K., Nuhu, N., & Jiao, L. (2024). The effect of Porter’s competitive forces on competitive advantage and organisational performance and the moderating role of management accounting practices. Journal of Management Control, 35(2), 303-332. doi:https://doi.org/10.1007/s00187-024-00375-4
- Bartlett, C. A., & Ghoshal, S. (2002). Managing across borders: The transnational solution: Harvard Business Press.
- Bilici, F. (2025). Customer satisfaction in construction projects: Impact of property type and income. Journal of Project Management, 10(4). doi:http://doi.org/10.5267/j.jpm.2025.8.004
- Caswell, H., Alidoust, S., & Corcoran, J. (2025). Planning for livable compact vertical cities: A quantitative systematic review of the impact of urban geometry on thermal and visual comfort in high-rise precincts. Sustainable Cities and Society, 119, 106007. doi:https://doi.org/10.1016/j.scs.2024.106007
- Crosby, P. B. (1979). Quality is free: The art of making quality certain. (No Title).
- Daniels, J. D., & Radebaugh, L. H. (2016). International business environments and operations: Pearson Education Limited.
- Deresky, H. (2000). International management: Managing across borders and cultures: Pearson Education India.
- Dulaimi, M. F., Y. Ling, F. Y., Ofori, G., & Silva, N. D. (2002). Enhancing integration and innovation in construction. Building research & information, 30(4), 237-247. doi:https://doi.org/10.1080/09613210110115207
- Easterby?Smith, M., Lyles, M. A., & Tsang, E. W. (2008). Inter?organizational knowledge transfer: Current themes and future prospects. Journal of Management Studies, 45(4), 677-690. doi:https://doi.org/10.1111/j.1467-6486.2008.00773.x
- El-shabrawy, A., Kotb, M., & Saad Atwa, M. (2020). ????? ??? ????? ??????? ??????? ????? ???? ????? ?????? Applying Quality Management System and Effect on Execution of Construction Projects. Engineering Research Journal, 166(0), 296-319. doi:https://doi.org/10.21608/erj.2020.138859
- Eyiah, A. K., Bondinuba, F. K., Adu-Gyamfi, L., & Liphadzi, M. (2025). Promoting effective management of cultural diversity in multinational construction project teams. Buildings, 15(5), 659. doi:https://doi.org/10.3390/buildings15050659
- Guide, P. (2008). A guide to the project management body of knowledge.
- Hussain, S., FangWei, Z., & Ali, Z. (2019). Examining influence of construction projects’ quality factors on client satisfaction using partial least squares structural equation modeling. Journal of Construction Engineering and Management, 145(5), 05019006. doi:https://doi.org/10.1061/(ASCE)CO.1943-7862.0001655
- Kerzner, H. (2025). Project management: a systems approach to planning, scheduling, and controlling: John Wiley & Sons.
- Kristiyani, S. T., Marlissa, E. R., & Urip, T. P. (2025). The influence of village fund capital participation in Village-Owned Enterprises on the development of Village-Owned Enterprises and the economy of the Wania District community. Studies in Economy and Public Policy, 1(2), 73-87. doi:https://doi.org/10.35912/sepp.v1i2.3713
- Kumar, V., Mishra, P., Yadav, S. B., & Gupta, S. K. (2023). In-group and out-group behavior in Indian multinational corporations: An analysis of its implications on organizational performance. Problems and Perspectives in Management, 21(3), 189. doi:http://dx.doi.org/10.21511/ppm.21(3).2023.15
- Maesaroh, M., & Faturohman, T. (2024). Impact of customer default on cash conversion cycle and net working capital in construction company. International Journal of Financial, Accounting, and Management, 6(3), 313-331. doi:https://doi.org/10.35912/ijfam.v6i3.2120
- Moshood, T. D., Rotimi, F. E., & Rotimi, J. O. B. (2022). Knowledge transfer and management in the construction industry: Trends and future challenges. International Journal of Construction Supply Chain Management, 12(1). doi:https://doi.org/10.14424/ijcscm120122-72-102
- Murib, A. (2025). Analysis of factors inhibiting the development of decent housing for the community in Nduga Regency. Studies in Economy and Public Policy, 1(2), 57-72. doi:https://doi.org/10.35912/sepp.v1i2.3712
- Nasrum, N., Iek, M., & Ngutra, R. N. (2025). Analysis of the efficiency and effectiveness of the budget for the DPR's aspirational funds in Mimika Regency. Dynamics of Politics and Democracy, 3(2), 79-88. doi:https://doi.org/10.35912/dpd.v3i2.3274
- Nonaka, I. (2009). The knowledge-creating company The economic impact of knowledge (pp. 175-187): Routledge.
- Nubatonis, M., Kase, P., & Nursalam, N. (2021). Implementation of building construction permit in So'e city, South Timor Tengah regency (TTS). Journal of Governance and Accountability Studies, 1(2), 103-119. doi:https://doi.org/10.35912/jgas.v1i2.147
- Ochieng, E. G., & Price, A. D. (2010). Managing cross-cultural communication in multicultural construction project teams: The case of Kenya and UK. International Journal of Project Management, 28(5), 449-460. doi:https://doi.org/10.1016/j.ijproman.2009.08.001
- Rodhi, N. N. (2025). Strategy to improve human resource performance in construction services companies. Annals of Human Resource Management Research, 5(1), 199-207. doi:https://doi.org/10.35912/ahrmr.v5i1.2924
- Shehu, S., & Shehu, R. (2023). Quality performance indicators of building construction projects in Nigeria. Borneo Journal of Social Sciences & Humanities, 5(2). doi:https://doi.org/10.35370/bjssh.2023.5.2-03
- Ulhaq, I., Khalfan, M. M., Maqsood, T., & Le, T. (2017). Development of a conceptual framework for knowledge management within construction project supply chain. International Journal of Knowledge Management Studies, 8(3-4), 191-209. doi:https://doi.org/10.1504/IJKMS.2017.087066
- Yahya, S. M. A., & Alabdullah, S. F. I. (2022). Total quality management in construction projects in Jordan. European Journal of Business and Management Research, 7(2), 63-68.
- Zhang, Q., Tang, W., Liu, J., Duffiel, C. F., Hui, F. K. P., Zhang, L., & Zhang, X. (2018). Improving design performance by alliance between contractors and designers in international hydropower EPC projects from the perspective of Chinese construction companies. Sustainability, 10(4), 1171. doi:https://doi.org/10.3390/su10041171